The April 2026 enforcement cycle created a resource-scarcity feedback loop: upstream providers cut lines with no obligation to refund resellers, newly acquired replacement resources can themselves be reported and cut within days, and stable-resource availability windows are described as "越来越短" (increasingly short) while costs rise concurrently. The overall effect is systemic capacity contraction forecast to continue through at least May 2026.
From 2026-ermao-april-airport-outage — 2026年四月机场断线潮详解:通报、拔线与涨价预期下,普通用户该怎么应对 / Anatomy of the April 2026 China VPN-Reseller Outage Wave
· §这轮波动到底发生了什么 / §四月后的趋势判断
· 2026
· ermao.net (Chinese-language circumvention blog)
Implications
Economic models for CN circumvention infrastructure must account for rapid resource turnover and irrecoverable sunk costs; infrastructure-as-code with fast provisioning pipelines is operationally necessary.
Capacity planning for CN-targeted tools should assume sustained contraction, not temporary spikes; reserve-capacity buffers and pre-vetted alternative resource pools are load-bearing, not optional.